The 2001 Extension |
|---|
Ride on Railways

A new passing loop with a difference.
![]() |
The new shed will eventually have double track running through which will be screeded into the floor slab. To add to the railway feel a nice plastic valance. NB tunnel to the right of the shed |
| The curved wall on the left leans out to act as a retaining wall for the tunnel. The back is sealed and provided with a drainage pipe to stop water build up. Eventually this tunnel will be our main rolling stock storage area. | ![]() |
|
Looking out of the new tunnel with its newly completed roof. The wall on the left is the retailing wall and is leaning to help support the soil on the other side. |
| Right - Site of the new proposed station. The track is to be straightend and a new inner loop put in. We ended up with a little more soil than we originally thought so the retaining wall is to be extended. |
|
| Looking towards the house showing just how much soil has to be shifted to cover up the tunnel. | ![]() |